ICIDc-MTD

A-B-C-D-E-F-G-H-I-J-K-L-M-N-O-P-Q-R-S-T-U-V-W-X-Y-Z


Irrigation Dictionary : Table of Contents (members login required)\t
________________________________________________
Search
beginning of word full word and in description
Show References (chapter/section)Yes No

Login : Adminstrator Area

Last 10 definitions

5892. Cantilever-type single-tier formwork : Formwork when the studs extend considerably below the panel sheathing. The stud extensions are provided with two rows of anchor bolts, fastened to two corresponding rows of anchors, embedded in the concrete of the previous block. This restrains the end of the stud and enables it to function, in effect, as a cantilever, subject to lateral pressure from the concrete. The third, upper row of anchor bolts, holds the inserted anchors properly positioned during concreting and is disconnected from them during formwork removal (illustrated).

Compare with :French, Hindi, Russian, Japanese, Chinese, Base Language : English
Available languages :French, Hindi, Russian, Japanese, Chinese, Base Language : English


Back
5892. Coffrage semi-glissant travaillant en porte-à-faux : Coffrage dans lequel les montants sont prolongés considérablement au-dessous de la partie coffrante. Les prolongements des montants sont pourvus de deux rangées de boulons d`ancrage fixés à deux rangées correspondantes d`ancrages noyés dans le béton du plot précédent. Ceux-ci fixent l`extrémité du montant et lui permettent en fait de travailler comme une poutre en porte-à-faux soumise à la pression latérale du béton. La troisième rangée, supérieure, de boulons d`ancrage maintient les ancrages enfoncés en position appropriée pendant le bétonnage et en est détachée pendant la dépose du coffrage (voir figure).
VOIR:

Compare with :English, Hindi, Russian, Japanese, Chinese, Base Language : French
Available languages :English, Hindi, Russian, Japanese, Chinese, Base Language : French


Back